Search This Blog

Monday, September 9, 2024

Preparing For Big Plant Shoot

Preparing for the big 2 day industrial shoot at the plant. I fixed my leaning sink (for now) and redid all the windows. I simplified things by removing the magnet strips and ruby lith and taped on light proof black plastic.

No comments:

Post a Comment

Diptych and Triptych Design

Was thinking of a possible design for my Ambros in dip and triptychs, using hinges. The idea is to able to mount 11x14 inch and 14x14 inches...